Back to all projects

M Residence Solis 3

Project

Malinova Dolina district

Project status

Awaiting construction permit

Completion deadline

Early 2029

Location

жк. Малинова Долина

Information

Entrances

  • 2

Floors

  • 5+2

Apartments

  • 126

Offices

  • 19

Located in the Malinova Dolina district, directly south of M Residence Solis II and opposite Sofia Ring Mall, IKEA, and the upcoming retail park, M Residence Solis III combines an excellent location, functional architecture, and a contemporary urban lifestyle.

The project comprises a residential building with two separate entrances—A and B—unified within a single architectural composition. It features a total of 126 studio and one-bedroom apartments and 19 offices, designed with careful attention to efficient use of space, natural light, and everyday comfort.

The architecture is distinguished by clean lines, expansive windows, and rhythmically arranged balconies with glass railings. Vertical façade elements break up the building’s elongated volume, creating a dynamic, distinctive, and contemporary appearance.

The development will follow the established quality standard of M Residence Solis II. Construction is scheduled to begin in September 2026 and be completed in 2029.

Property type

Location

Project

Advantages

Technical characteristics

CONSTRUCTION

The building is constructed with a monolithic reinforced concrete structure, providing a solid and stable foundation.

FACADES

The facades of M Residence Solis will be finished with high-quality mineral plaster, which ensures long-lasting durability.

ROOFS

The roofs are flat and are fully thermally insulated, vapor-sealed, and waterproofed to ensure long-lasting protection and effective insulation.

MASONRY

The exterior and interior walls are built with Wienerberger bricks from Austria.

RAILINGS

The railings will be made of glass or metal to complement the elegant look of the building.

THERMAL INSULATION

The thermal insulation system is from BAUMIT PRO with a thickness of 100 mm, also from Austria, for optimal energy efficiency.

FACADE LIGHTING

Facade lighting will be integrated and controlled with a timer for automatic on and off.

JOINERY

The glass units of the windows will be six-chamber, made of German PVC profile with triple glazing, providing excellent noise insulation and energy efficiency.

ELEVATORS

The building is equipped with high-quality elevators from brands such as ORONA, KONE, OTIS, with stainless steel cabins and modern functionalities.

TERRACES

The floors of the terraces are made of high-quality Italian granite tiles for outdoor use, the ceilings are according to an architectural design. The terraces have heated anti-freeze funnels for effective drainage.

COMMON PARTS

The central lobby and floor corridors are finished with gypsum plaster, putty and latex, and the flooring is made of high-quality granite tiles according to the project.

PARKING

Underground parking with automatic garage doors of the "flying wing" type. Polished concrete flooring, ventilation system and marking according to the project. The underground parking has modern electrical installation and lighting.

HEATING AND COOLING

Built-in copper routes for easy and aesthetic installation of air conditioning systems. This saves time and inconvenience and guarantees clean and professional execution, without additional construction interventions after commissioning.

PLUMBING

The water supply system is made of polypropylene pipes. Individual water meters with remote reading. The sewage system is made of PVC pipes, discharged into the city sewer.

ELECTRICAL INSTALLATION

Fully finished with installed central and apartment electrical panels. Circuit breakers and surge protection are included. The lighting in the rooms is designed according to their functions.

LIGHTNING PROTECTION

The facility is provided with a lightning protection installation designed to prevent direct and indirect lightning strikes on the building.

GROUNDING INSTALLATION

A basic element for protecting the electrical installation. Prevents damage and risks from high voltages arising from lightning strikes or switching processes.

Parking and garages

Outdoor parking spaces

Underground parking spaces

Garages

Location

Payment methods

Preferential mortgage terms through a partner bank.

Preferential mortgage terms through a partner bank

If none of the available payment plans suits your circumstances, we would be happy to discuss a tailored option and the most suitable way for you to become a property owner.

Please contact us to discuss the available options.

Construction stage

Start of project

September 2026

Next stage: Building permit

End of project

Early 2029

ACT 2

ACT 14

Rough construction (Article 181)

ACT 15

ACT 16

Contact form

Have questions or would like to schedule a viewing? We’re here to help! Don’t hesitate to contact us.