Back to all projects

M Residence 7052

Project

1 Prof. Zhivko Stalev Street

Project status

Under construction

Completion deadline

November 2028

Location

жк. Малинова Долина

Information

Buildings

  • 2

Floors

  • 4+2

Apartments

  • 102

The new M Residence project in Malinova Dolina occupies a strategic location on the newly designed and soon-to-be-opened Prof. Zhivko Stalev Street — a key new connection to Okolovrasten Road (Sofia Ring Road). This significantly improves access to the city’s main arteries as well as to the capital’s primary exit routes.

Situated in one of Sofia’s most dynamically developing areas, the project combines fast connectivity to the city with a sense of space and tranquility, characteristic of the foothills of Vitosha Mountain. The location offers convenient access to business districts, universities, shopping centers, and future infrastructure developments that will further increase the investment value.

The project follows the M Residence philosophy of creating a contemporary, elegant, and highly functional urban environment. The architectural concept is based on clean lines, natural materials, and optimally designed spaces that ensure maximum comfort, natural light, and privacy for its residents.

This project is a natural continuation of our ambition to create not just buildings, but a sustainable, beautiful, and valuable environment for both living and investment.

Property type

Location

Project

3D tour

Advantages

Technical characteristics

CONSTRUCTION

The building is constructed with a monolithic reinforced concrete structure, providing a solid and stable foundation.

FACADES

The facades of M Residence Solis will be finished with high-quality mineral plaster, which ensures long-lasting durability.

ROOFS

The roofs are flat and are fully thermally insulated, vapor-sealed, and waterproofed to ensure long-lasting protection and effective insulation.

MASONRY

The exterior and interior walls are built with Wienerberger bricks from Austria.

RAILINGS

The railings will be made of glass or metal to complement the elegant look of the building.

THERMAL INSULATION

The thermal insulation system is from BAUMIT PRO with a thickness of 100 mm, also from Austria, for optimal energy efficiency.

FACADE LIGHTING

Facade lighting will be integrated and controlled with a timer for automatic on and off.

JOINERY

The glass units of the windows will be six-chamber, made of German PVC profile with triple glazing, providing excellent noise insulation and energy efficiency.

ELEVATORS

The building is equipped with high-quality elevators from brands such as ORONA, KONE, OTIS, with stainless steel cabins and modern functionalities.

TERRACES

The floors of the terraces are made of high-quality Italian granite tiles for outdoor use, the ceilings are according to an architectural design. The terraces have heated anti-freeze funnels for effective drainage.

COMMON PARTS

The central lobby and floor corridors are finished with gypsum plaster, putty and latex, and the flooring is made of high-quality granite tiles according to the project.

PARKING

Underground parking with automatic garage doors of the "flying wing" type. Polished concrete flooring, ventilation system and marking according to the project. The underground parking has modern electrical installation and lighting.

HEATING AND COOLING

Built-in copper routes for easy and aesthetic installation of air conditioning systems. This saves time and inconvenience and guarantees clean and professional execution, without additional construction interventions after commissioning.

PLUMBING

The water supply system is made of polypropylene pipes. Individual water meters with remote reading. The sewage system is made of PVC pipes, discharged into the city sewer.

ELECTRICAL INSTALLATION

Fully finished with installed central and apartment electrical panels. Circuit breakers and surge protection are included. The lighting in the rooms is designed according to their functions.

LIGHTNING PROTECTION

The facility is provided with a lightning protection installation designed to prevent direct and indirect lightning strikes on the building.

GROUNDING INSTALLATION

A basic element for protecting the electrical installation. Prevents damage and risks from high voltages arising from lightning strikes or switching processes.

Parking and garages

Outdoor parking spaces

  • Number of available 20

Underground parking spaces

  • Number of available 27

Garages

  • Number of available 78

Location

Payment methods

Standart Payment Plan
Variant (1)
  • 30% Upon signing a preliminary contract
  • 20% ACT 14
  • 20% Certificate under Article 181
  • 20% ACT 15
  • 10% АCT 16

Construction stage

ACT 2

ACT 14

Rough construction (Article 181)

ACT 15

ACT 16

Contact form